[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text] Overview BSG Ecology was commissioned by EDF Renewables UK to attempt to resolve ornithological concerns with regard to the proposed 17 turbine Garn Fach Wind Farm, near Llanbadarn Fynydd, Powys. BSG worked with the consultant team to engage with Natural...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_single_image image="16585" img_size="1400x400" alignment="center" qode_css_animation=""][vc_empty_space][vc_column_text] Background BSG Ecology was commissioned by Enso Energy and Iron Acton Green Ltd to provide ecological support for their proposed solar farm in Gloucestershire. BSG was able to successfully apply Natural England Licencing Policy 4...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text] Background A planning application for a wind farm at Garreg Lwyd Hill near Llanbadarn Fynydd (Powys) was submitted to Powys County Council in 2008.   A separate application was submitted for highways upgrades and associated works to facilitate access to...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text] Background The Riverside Resource Recovery (RRR) Facility involved the construction and operation of an Energy from Waste (EfW) Power Station of 72 MW capacity on the southern bank of the River Thames off Norman Road, Belvedere, Bexley.  The main...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text] Background BSG Ecology was instructed by Juno Energy to undertake an ecological survey and assessment of a small afforested site near Swansea. The proposal concerned the development of a 1 MW photovoltaic array within an area of commercial forestry (grown...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text] Background BSG Ecology has provided technical ecological and ornithological inputs to Due Diligence work on behalf of Peel Group concerning the potential acquisition of eleven proposed Scottish wind farms, including a portfolio of sites offered for sale by a...